Project Dashboard

Isachsen HAWS Phase II/III Environmental Site Assessment (148718)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: Amendment
Proponent name: Chris Bowie
Company: Stantec Consulting Ltd.
Start Date: 2018-02-01
End Date: 2019-09-30
Operation Type: Annual
Project Description:
Collect soil, water, and sediment samples to assess the Environemnt Canada Site for the presence/absence of impacts due to historical activities to the local environment.
Summary of Modifications:
The proposed Phase II/III ESA sampling and camp crew were not able to make it to the site in the summer of 2017 due to poor weather conditions. Therefore we plan on conducting the program in the summer of 2018 and 2019, if required. The plan is to have upto a total of 9 field personnel on site for 2-two week periods (two weeks in 2018 and two weeks in 2019) to complete the original proposed plan. In addition a small crew of two or three persons are propsoed to mobilize our small camp in April 2018 to minimize the mobilization time in the summer months when the weather is more volatile.
Persons: 9
Days: 30
Project Map
List of all project geometries:
ID Geometry Location Name
3331 point
Planning Regions:
Affected Areas and Land Types
Settlement Area
North Baffin Planning Region
Project Land Use and Authorizations
Project Land Use
Licensing Agencies
INAC: INAC - Land USe Permit Class B - N2017X0015 expires 2022
NWB: Authorized with the NWB for 'Approval for the Use of Waters and/or Deposit of Waste Without a Licence for the Isachsen former High Arctic Weather Station Phase II/III Environmental Assessment. Expires in July 2018 but is to be renewed in Winter 2018 for upcoiming 2018 field season.
Other Licensing Requirements
No data found.
Material Use
Type Quantity Size Use
No records found.
Fuel Use
Type Container(s) Capacity UOM Use
No records found.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
Waste and Impacts
Environmental Impacts
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application related document - Conformity Determination Letter
Recieved: 2018-03-09
Originator: Goump Djalogue
Public Registry ID: 13768
Document Size: 608.36 Kb


Environmental Protection:
s3.13.8: The applicant undertakes to prevent any new occurrences of pollution, garbage and contamination at the site of the development.

Removal of Fuel Drums:
s3.13.8: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.

New Site Restoration and Clean Up:
s3.13.1 and Appendix H, s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.

Low-Level Air Flights:
Appendix H, s3: Will the applicant avoid all low-level flights?

Caribou Protection Measures:
s3.3.7 and Appendix D: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix D?

Caribou Water Crossings:
s3.3.7 and map: Will the applicant avoid, between may 15 and September 1, to construct any camp, cache any fuel or conduct any blasting within 10 km of any Designated Caribou Water Crossing identified

Polar Bear Denning Areas and Walrus Haul-outs:
s3.3.8: Will the applicant keep its activities away from any polar bear denning area or walrus haul-out?

Reporting of Archaeological Sites:
s3.11.3 and Appendix H, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Department of Culture, Language, Elders and Youth (GN)?