Arviat Fuel Capacity Increase (148944)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Lisa Mitchell
Company: Government of Nunavut
Schedule:
Start Date: 2018-09-11
End Date: 2022-10-31
Operation Type: Annual
Project Description:
Government of Nunavut (GN) Department of Community and Government Services (CGS) through the Petroleum Product Division (PPD) provide bulk fuel storage and distribution of Gasoline and Diesel (ULSDL) petroleum products for the community of Arviat, NU. PPD has identified that the current bulk fuel storage facility at Arviat is in need of expansion and code upgrades. The optimal option of the bulk fuel storage expansion in Arviat is to propose a new tank farm east of Arviat (location shown on map). This option will satisfy ULSDL (diesel) and gasoline demand in 20 years for fuel capacity projection. Four vertical tanks would be constructed; three ULSLD (20.8m Dia, 3333 m3 capacity) and one new gasoline (20.85 Dia, 3333 m3 capacity). The development of a new tank farm would require decommissioning the existing 920 m long resupply pipeline and Arviat Tank Farm Facility once the new resupply and tank farm facility is operational. A new dispenser and operator shelter building will be required with sloped roof design in accordance with NBC and PPD standards.
Personnel:
Persons: 30
Days: 200
Project Map
List of all project geometries:
ID Geometry Location Name
4638 polyline Proposed New Tank Farm Site
4639 polyline Proposed New Tank Farm Site
4640 polyline Existing Tank Farm
4641 polyline Existing Tank Farm
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Municipal
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Permanent Structures
Pipeline
Licensing Agencies
NIRB: 0
NWB: 0
EC: 0
CG&S: 0
TC: 0
GN-DOE: 0
INAC: 0
DFO: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
No records found.
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 3 3333000 Liters Will meet and exceed forcasted fuel storage requirements in 20 years.
Gasoline 1 3333000 Liters Will meet and exceed forecasted fuel storage requirements in 20 years.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
The marshes in this area would need to be filled in to build the tank farm.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - Project description
Recieved: 2018-09-11
Originator: Lisa Mitchell
Public Registry ID: 14635
Document Size: 4970.8 Kb
Category: Application form attachment - Project description
Recieved: 2018-09-11
Originator: Lisa Mitchell
Public Registry ID: 14636
Document Size: 369.6 Kb
2018-09-11 11:35:47, from: Lisa Mitchell
 I am looking to get the site for the proposed new tank farm in Arviat to be rezoned to accommodate a tank farm. The location of the proposed site can be seen in the attachments to this application.

2018-09-11 11:46:23, from: Lisa Mitchell
 The proposed new tank farm site is currently zoned as Municipal Reserve.

2018-09-21 08:41:13, from: Lisa Mitchell
 The proposed tank farm site is on commissioners land and within Hamlet of Arviat boundary. There are no permits for this site. Lisa

2018-09-21 08:42:02, from: Lisa Mitchell
 The proposed tank farm site is on commissioners land and within Hamlet of Arviat boundary. There are no permits for this site. Lisa

2018-09-21 14:20:55, from: Lisa Mitchell
 To construct the new facility the following permits will be required: - Rezoning from the Hamlet of Arviat - Nunavut Water Board - NIRB

2018-10-10 10:45:17, from: Lisa Mitchell
 To my knowledge there are no existing licenses or authorizing agencies for this section of land.

2018-10-10 10:57:42, from: Lisa Mitchell
 To my knowledge there are no existing licenses or authorizing agencies for this section of land.

2018-10-18 15:46:13, from: Lisa Mitchell
 To my knowledge these are the organizations which are Authorities Having Jurisdiction as the project moves forward: •Nunavut Planning Commission oNIRB oNunavut Water Board (NWB) •Hamlet of Arviat •Hunters and trappers Group- Arviat •ED &T Airport, Government of Canada and NAVCANADA •Environment Canada •Office of the Safety Services Division- Government of Nunavut oChief Building Official (CBO) oOffice of Fire Marshall (OFM) oChief Electrical and Elevator Inspector oGas, Boiler and Pressure vessel Inspector •Fisheries and Oceans Canada •Environment and Climate Change Canada •Department of Environment- Government of Nunavut •Indigenous and Northern Affairs Canada (INAC) •Kivalliq Inuit Association (KIA)

2018-10-19 09:12:21, from: Lisa Mitchell
 I would also like to add Transport Canada to the above list.

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
YES

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES