Project Dashboard

GOT Exploration Project (149037)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: David Frenette
Company: Agnico Eagle Mines Ltd.
Schedule:
Start Date: 2019-06-01
End Date: 2025-10-01
Operation Type: Seasonal
Project Description:
Agnico Eagle Mines Limited (Agnico Eagle) possesses mineral properties located on Crown and Inuit Owned Lands located north and northwest of the Amaruq property at a distance between 130km to 150km of the Baker Lake community. The exploration activities planned on these properties include prospection, till sampling, geophysical surveys and drilling. The present application has been prepared with the objective to obtain a water license and a land use permit authorizing mineral exploration activities on the mineral properties.
Personnel:
Persons: 10
Days: 30
Project Map
List of all project geometries:
ID Geometry Location Name
4818 polygon GOT Exploration Project
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Licensing Agencies
INAC: Class B Land Use Permit
NWB: Type B Licence
NIRB: Screening Decision Report
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Diamond Drill 1 21500kg To obtain rock cores.
Mini excavator 1 1100kg To obtain soil samples.
Helicopter 1 1500kg To transport material, equipment and workers.
Fuel Use
Type Container(s) Capacity UOM Use
Aviation fuel 10 205 Liters For the helicopter use.
Diesel 10 205 Liters For the diamond drill and equipment.
Diesel 4 600 Liters For the diamond drill and equipment.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Grease 5 25 Liters Equipment maintenance.
Glycol 2 25 Liters Equipment maintenance
Oil 5 25 Liters Equipment maintenance
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
299 By pumping Ponds, lakes, rivers, proximal to drilling sites.
Waste and Impacts
Environmental Impacts
Exploration activities in this area are, at this time, planned to be low scale and generate minimal environmental impacts. With all conditions that will be include in NIRB decision, CIRNAC permit, Nunavut Water Board water licence and Agnico Eagle internal management plans, the potential impacts will be mitigated
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Combustible wastes 200 kg NA Transport to Amaruq camp site for disposal.
Hazardous waste 1000 Litres Recycling or safe disposal. Transport in southern facility.
Non-Combustible wastes 500kg NA Transport to Amaruq camp site for disposal.
Category: Imported geometry - proect geometry
Recieved: 2019-01-28
Originator: David Frenette
Public Registry ID: 15291
Document Size: 6.76 Kb
Category: Application form attachment - Project description
Recieved: 2019-01-28
Originator: David Frenette
Public Registry ID: 15296
Document Size: 522.97 Kb

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES

Uranium Development and Mining:
s3.4.5, s3.4.6: Does the project proposal involve either uranium development or uranium mining?
NO


New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES