Project Dashboard

Pilot Biscuit (149205)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Travis
Company: Travis Kalluak
Schedule:
Start Date: 2019-08-04
End Date: 2019-08-04
Operation Type: Annual
Project Description:
Project location within Inuit Owned Land Parcel AR-27 Project will be up to 10 man days Project start date if possible to be August 26-30, 2019 Any inuit heritage and/or caribou siting will be noted within daily prospection diary All garbage debris will be brought back to Arviat Minimum use of water of up to 5 gallons retrieved from lake
Personnel:
Persons: 2
Days: 5
Project Map
List of all project geometries:
ID Geometry Location Name
5782 point New project geometry
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Inuit Owned Surface Lands
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Licensing Agencies
KivIA: Land Use Licence I
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Float Plane 1 4 seater To charter a float plane to bring us there and back.
Fuel Use
Type Container(s) Capacity UOM Use
No records found.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Naptha 1 2 Gallons to use only for cooking and heating our tent
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
1 water jug Henik Lake
Waste and Impacts
Environmental Impacts
Any waste during project will be brought back to Arviat and properly disposed of.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - Project description
Recieved: 2019-08-04
Originator: Travis
Public Registry ID: 16803
Document Size: 470.62 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2019-08-06
Originator: Peter Scholz
Public Registry ID: 16807
Document Size: 473.77 Kb
2019-08-04 15:57:31, from: Travis
 Any questions my address and info below Travis Kalluak PO Box 68 Arviat, NU X0C0E0 email: tkalluak@outlook.com cell: 204-588-7488

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES

Uranium Development and Mining:
s3.4.5, s3.4.6: Does the project proposal involve either uranium development or uranium mining?
NO


New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES