Grise Fiord Landfarm (148844)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Maurice Guimond
Company: Qulliq Energy Corporation
Schedule:
Start Date: 2018-09-30
End Date: 2022-09-30
Operation Type: Seasonal
Project Description:
A fuel spill occurred at the Grise Fiord power plant in March 2018. QEC plans to build a landfarm of sufficient size to hold the contaminated soil resulting from the spill and remediate the soil over a period of 3 to 5 years. The landfarm will be engineered to last and to benefit the community by providing a protective space to shield hazardous soils from the environment.
Personnel:
Persons: 3
Days: 5
Project Map
List of all project geometries:
ID Geometry Location Name
3775 polygon Area is 30m X 60m and 512m northwest of the runway in Grise Fiord for the proposed landfarm cell
Planning Regions:
Kivalliq
Affected Areas and Land Types
Municipal
Settlement Area
North Baffin Planning Region
Project Land Use and Authorizations
Project Land Use
Site Cleanup/Remediation
Site Cleanup/Remediation
Licensing Agencies
CG&S: 0
INAC: Surface Leases/Licences
GN-DOE: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Excavator 1 large move soil and gravel to build landfarm berm walls and floor
Loader 1 large Move contaminated soil
dump truck 1 10 m3 Move soil into landfarm
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 1 205 Liters Supply fuel to heavy equipment
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
The project proposes storage of contaminated soils. This has potential effects on the nearby environment if contamination escapes the containment cell. The cell therefore will be engineered to a strict specification and build by an accredited environmental contractor.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - Other Authorizations
Recieved: 2018-05-02
Originator: Maurice Guimond
Public Registry ID: 14187
Document Size: 1716.33 Kb
Category: Application form attachment - Project description
Recieved: 2018-05-02
Originator: Maurice Guimond
Public Registry ID: 14186
Document Size: 4462.17 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2018-06-01
Originator: Goump Djalogue
Public Registry ID: 14319
Document Size: 597.48 Kb

NORTH BAFFIN QUESTIONAIRE

GENERAL
Environmental Protection:
s3.13.8: The applicant undertakes to prevent any new occurrences of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s3.13.8: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s3.13.1 and Appendix H, s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low-Level Air Flights:
Appendix H, s3: Will the applicant avoid all low-level flights?
YES

Caribou Protection Measures:
s3.3.7 and Appendix D: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix D?
YES

Caribou Water Crossings:
s3.3.7 and map: Will the applicant avoid, between may 15 and September 1, to construct any camp, cache any fuel or conduct any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

Polar Bear Denning Areas and Walrus Haul-outs:
s3.3.8: Will the applicant keep its activities away from any polar bear denning area or walrus haul-out?
YES

HERITAGE RESOURCES
Reporting of Archaeological Sites:
s3.11.3 and Appendix H, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Department of Culture, Language, Elders and Youth (GN)?
YES