NPC Public Registry

NPC Public Registry Notices
148557: McConnell (Kuugaarjuk) Migratory Bird Sanctuary - Environmental Site Assessment
02 May 2017: Conformity Determination Issued: Project conforms, does not requires NIRB screening

148554: Adaptation to an ice-free summer by Arctic seabirds
26 April 2017: Conformity Determination Issued: Project conforms, does not requires NIRB screening

148548: Ongoing Seabird Research at Nasaruvaalik Island
25 April 2017: Closed w/o Conformity Determination, Renewal – No conformity or Screening Required.
not a significant modification, does not require screening
148533: Silversea Cruises Ltd., MS Silver Explorer, North Atlantic Adventure, 31 August - 15 September 2017, Voyage 7719
25 April 2017: Closed w/o Conformity Determination, Renewal – No conformity or Screening Required.

148556: Pond Inlet Air Monitoring
25 April 2017: Conformity Determination Issued: Project conforms, requires NIRB screening.

148410: Fury and Hecla Regional Airborne Survey
25 April 2017: Closed w/o Conformity Determination, Renewal – No conformity or Screening Required.
Not a significant modification, does not require screening.
148553: Deployment of environmental instrumentation in Greiner Lake watershed, Cambridge Bay, Victoria Island
25 April 2017: Closed w/o Conformity Determination, Renewal – No conformity or Screening Required.
not a significant modification, does not require screening
148555: Permafrost-active layer dynamics and feedbacks with climate forcing in ice-rich sediments, Fosheim Peninsula, Ellesmere Island, Nunavut
24 April 2017: Conformity Determination Issued: Project conforms, requires NIRB screening.

148495: Le Boreal 2017 - Cruise Kangerlussuaq, Greenland to Nome, Alaska from August 10th, 2017 to September 13th, 2017
24 April 2017: Closed w/o Conformity Determination, Renewal – No conformity or Screening Required.
Not a significant modification to project scope, no screening required.
148518: Using historic and modern cyanobacteria to identify microbes as sentinels for Arctic environments
20 April 2017: Closed w/o Conformity Determination, No land use plan, requires screening.