Project Dashboard

Water Licence # 3BM-CLY 1419 of the Hamlet of Clyde River Renewal Application (149071)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Bhabesh Roy
Company: GN-CGS
Schedule:
Start Date: 2019-03-05
End Date: 2029-03-05
Operation Type: Annual
Project Description:
ᐊᐅᓚᑦᓯᔨᓖᙶᖅᑐᑦ ᓇᐃᓪᓕᑎᖅᓯᒪᔪᑦ ᓄᓇᓕᖏᓐᓄᑦ ᑲᖏᖅᑐᒑᐱᐅᑉ; ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯ #3BM-CLY 1419; Type-B. ᑲᖏᖅᑐᒑᐱᒃ ᐃᓄᓐᓄᑦ ᓄᓇᓕᒋᔭᑐᖃᐅᕗᑦ ᐃᓄᖃᖅᓱᓂ ᒥᑦᓵᓃᑦᑐᓂᒃ 1031 ᐃᓂᖃᖅᓱᓂ ᓯᓈᖓᓂ ᕿᑭᖅᑖᓘᑉ ᐸᑐᕆᓴ ᑲᖏᖅᓱᖓᓂ, ᑲᖏᖅᑐᒑᐱᐅᑉ ᑲᖏᖅᓱᖓᓂ, ᐃᓚᒋᔭᐅᓪᓗᓂ ᕿᑭᖅᑖᓘᑉ ᐊᑯᑭᑦᑐᓪᓗ ᐃᑭᕋᓴᖓᓄᑦ ᕿᑭᖅᑖᓗᒻᒥ ᓄᓇᕗᒻᒥ. ᐃᓂᖃᖅᑐᖅ ᕿᑭᖅᑖᓗᒻᒥ ᐃᓐᓈᕈᓕᒻᒥ, ᐃᓚᒋᔭᐅᓪᓗᑎᒃ ᐅᑭᐅᖅᑕᖅᑐᒥ ᑯᐊᑎᓗᕋ ᐃᓐᓈᕈᖏᓐᓄᑦ. ᖃᐅᔨᒪᔭᐅᔪᖅ “ᐊᖅᑯᑎ ᑲᖏᖅᓱᓄᑦ”, ᑲᖏᖅᑐᒑᐱᒃ ᐃᓂᖃᖅᑐᖅ ᒪᓂᖅᑲᒥ, ᐊᕙᓗᔭᐅᒪᑦᓱᓂ ᑲᔾᔮᓇᖅᑐᒻᒪᕆᓐᓄᑦ ᑲᖏᖅᓱᓄᑦ ᑎᑭᐅᑎᓯᒪᔪᓄᑦ ᕚᓐᔅ ᐊᐅᔪᐃᑦᑐᕐᒧᑦ. ᕼᐋᒻᒪᓚᒃᑯᖏᑦ ᑲᖏᖅᑐᒑᐱᐅᑉ ᓄᓇᓕᓕᐅᕗᑦ ᕿᑭᖅᑖᓗᒻᒥ ᐃᓂᖃᖅᓱᓂ ᓄᓇᙳᐊᑎᒍᑦ Latitude 70027’N ᐊᒻᒪᓗ Longitude 68033’W, ᓯᓈᖓᓂ ᐸᑐᕆᓴ ᑲᖏᖅᓱᖓᑕ, ᑲᓇᓐᓇᖅᐸᓯᖓᓂ ᓯᓈᖓᓂ ᕿᑭᖅᑖᓘᑉ. ᐊᕐᕌᒍᒥ ᐊᐱᕙᑦᑐᖅ ᒥᑦᓵᓃᑦᑐᓂᒃ 169cm ᐊᒻᒪᓗ ᐊᕐᕌᒍᒥ ᓯᓚᓗᑉᐸᑦᓱᓂ ᒥᑦᓵᓃᑦᑐᓂᒃ 5cm. ᕕᕗᐊᕆᒥ ᓯᓚ ᓂᓪᓚᓱᓐᓂᖃᕋᔪᖅᑐᖅ -30oc ᔪᓚᐃᒥ ᑎᑭᐅᒪᒐᔪᑦᓱᓂ ᐅᖅᑰᓂᖓ 50C−ᒧᑦ. ᖁᐊᖅᐸᓪᓕᐊᒐᔪᓯᓲᖅ ᑕᖅᑭᖓᓂ ᓅᕙᐃᕝᕙ ᑭᓯᐊᓂ ᖁᐊᖅᓴᕋᐃᒍᓐᓇᕐᒥᔪᖅ ᓯᑕᕝᕙᒥ ᐅᑦᑑᕝᕙᒥᓘᓐᓃᑦ, ᐅᐱᕐᖓᐸᓪᓕᐊᓯᒐᔪᑦᓱᓂ ᒪᐃ ᓄᙳᐊᓂ ᔫᓂᒥᓘᓐᓃᑦ. ᓄᓇᓕᓐᓂ ᐋᖅᑭᐅᒪᔾᔪᑏᑦ ᐱᖃᓯᐅᔾᔨᔪᑦ: (1) ᐃᒻᒥᖅᑐᐃᕕᒃ ᐃᒻᒥᐸᑦᑐᖅ ᑕᓯᕐᒥᒃ ᓴᓗᒻᒪᓴᖅᑕᐅᕙᑦᓱᓂ ᐃᒥᖅᑕᐅᑎᒧᑦ ᐃᒻᒥᖅᑐᐃᑯᒻᒥ ᓄᓇᓯᐅᑎᒃᑯᑦ ᐃᒻᒦᕙᑦᓱᑎᒃ ᐊᑐᓂᑦ ᐃᓪᓗᓂ ᐃᒪᖃᐅᑎᓂᒃ. (2) ᓄᓇᓖᑦ ᐊᑕᐅᓯᕐᒥᒃ ᑭᓈᓗᒻᒥᒃ ᑯᕕᖅᓴᕐᕕᓖᑦ ᒥᓪᓗᐊᖅᑕᐅᓯᒪᔪᓂᒃ ᐊᑐᓂᑦ ᐃᓪᓗᓂᒃ ᓄᓇᓕᓐᓂ. ᑭᓈᓗᒃ ᓴᓗᒪᕿᔭᐅᖅᑳᐸᑦᑐᖅ ᐊᓂᑕᐅᙱᓐᓂᖓᓂ ᒪᓴᓐᓂᖓᓄᑦ, ᑭᖑᕐᖓᒍᑦ ᒪᓴᒃᑰᓚᐅᖅᓱᓂ ᑕᕆᐅᕐᒨᓕᑕᐃᓐᓇᖅᓱᓂ. (3) ᑕᖏᓕᓐᓄᑦ ᐊᑦᑕᕐᕕᒃ ᐱᖃᓯᐅᔾᔨᔪᖅ ᓴᓂᓐᓂᒃ, ᓴᓇᔨᓃᙶᖅᑐᓂᒃ ᓴᓂᓐᓂᒃ, ᓴᕕᕋ.ᔭᓐᓂᒃ ᓱᕈᓐᓇᖅᑐᓂᓪᓗ. ᒫᓐᓇ ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯᖓᑦ #3BM-CLY 1419; Type B ᑐᓂᔭᐅᔪᔪᖅ ᔪᓚᐃ 25, 2014 ᐃᓱᓕᕝᕕᑦᓴᖃᖅᓱᓂ ᔪᓚᐃ 24, 2019. ᐊᓯᔾᔨᖅᓯᒪᔪᖃᙱᑦᑐᖅ ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯ ᑐᓂᔭᐅᓚᐅᖅᓯᒪᒻᒪᓂᑦ. ᓄᓇᓖᑦ ᐃᓄᖃᖅᑐᑦ 1031 ᒥᑦᓵᓂ 2019−ᒥ ᐊᐅᓚᓂᖃᖅᓯᒪᑦᓱᑎᓪᓗ ᑖᒃᑯᐊ ᓚᐃᓴᓐᓯᑖᖅᑎᑕᐅᓯᒪᔪᑦ ᐃᓪᓗᐃᑦ ᐱᕕᓕᒫᒃᑯᑦ. ᐃᒥᕐᒧᑦ ᐱᔪᓐᓇᐅᑎᓖᑦ 38,000 ᑭᑉᐹᕆᑦᑐᑦ ᒦᑕᐃᑦ ᐊᕐᕌᒍᑕᒫᑦ. ᐃᒻᒥᖅᑐᐃᕕᒃ ᐊᑖᓃᑦᑐᖅ ᐱᒻᒪᕆᐅᑏᑦ ᐊᐅᓚᔾᔪᑎᖏᑦᑕ ᓂᕆᐅᒋᔭᐅᑦᓱᓂᓗ ᐃᓇᖏᖅᑕᐅᒐᔭᕆᐊᖏᑦ ᐊᕐᕌᒍᓂ 3-5−ᓂ ᐊᒡᒋᖅᑐᓂ. ᒫᓐᓇ ᑐᑭᓯᓂᐊᖅᑎᒧᑦ ᑲᒪᒋᔭᐅᔪᑦ ᖃᐅᔨᓴᖅᑲᐅᑦᓱᓂ ᐃᒥᐅᑉ ᐱᐅᓂᖓ ᐅᑭᐅᒃᑯᑦ ᐊᐅᔭᒃᑯᓪᓗ. ᐊᓯᐊᓂᒃ ᑐᑭᓯᓂᐊᖅᑎᒥᒃ ᐱᓕᕆᔪᖃᖅᑐᖅ ᑎᑎᖅᑑᔭᖅᓯᒪᒪᓂᖓᓂᒃ ᑲᔪᓯᒍᓐᓇᕐᒪᖔᕐᓗ ᖃᐅᔨᕐᓴᓂᖅ ᓄᓇᓕᓐᓂ ᐊᑦᑕᑯᓂᒃ ᐊᐅᓚᑦᓯᓂᖅ. ᐊᑦᑕᕐᕕᑖᖅᑲᐅᒐᔭᕆᐊᖏᑦ ᓂᕆᐅᓇᖅᑐᖅ ᐊᕐᕌᒍᐃᑦ ᐱᖓᓱᑦ ᐃᓗᐊᓐᓂ. ᓄᓇᓖᑦ ᖃᐅᔨᓴᖏᓐᓇᕆᐊᓖᑦ ᐃᒥᕐᒥᒃ, ᓴᓗᒪᖅᑕᐅᓯᒪᔪᒥᒃ ᐃᒥᕐᒥᒃ, ᑯᕕᖅᓴᖅᑕᐅᔪᓂᓪᓗ ᐊᕐᕌᒍᑕᒫᑦ. ᐊᕐᕌᒍᑕᒫᑦ ᐅᓂᒃᑳᓕᐅᖃᑦᑕᕆᐊᖃᕐᓂᖓ ᐅᓪᓗᒥᒧᑦ ᑲᔪᓯᑦᓯᐊᖅᓯᒪᔪᖅ. Executive Summary of the Municipality of Clyde River; Water Licence #3BM-CLY 1419; Type-B. Clyde River is a traditional Inuit community of approximately 1031 residents located on the shore of Baffin Island’s Patricia Bay, off Clyde Inlet, an arm of Davis Strait in the Qikiqtaaluk Region of Nunavut. It lies in the Baffin Mountains, which in turn form part of the Arctic Cordillera mountain range. Known as the “Gateway to the Fiords”, Clyde River is located on a flood plain, surrounded by spectacular fiords that stretch all the way into the Barnes Icecap. The Municipality of Clyde River is a Community of Baffin Region and located at Latitude 70027’N and Longitude 68033’W, on the shore of Patricia Bay, on the east coast of Baffin Island. The annual snowfall is about 169cm and the annual rainfall is about 5cm. In February the daily mean temperature is about -30oc while in July the daily mean temperature is about 50C. Freeze up usually occurs during the month of November but may occur as early as September or October, while spring thaw usually occurs late May and June. The Community infrastructure includes: (1) a water supply facility which draws water from a Natural Lake and disinfected in the Truck fill station and delivered by water trucks into holding tanks in each building. (2) The Community has a single cell sewage lagoon which receives trucked sewage (wastewater) from the holding tanks in each building. The sewage is being naturally treated there before disposal to the wetland land. after the wetland treatment finally discharged into the Sea. (3) The Solid waste facility which includes domestic wastes, construction wastes, metal wastes and hazardous goods. The current water licence #3BM-CLY 1419; Type B was issued on July 25, 2014 and will be expired on July 24, 2019. Nothing was changed since the Water Licence was issued. The municipality has population1031 in 2019 and has been operating these licensed facilities to their best ability. They have water permit 38,000 cubic meters annually. The water Truck fill station is under the Capital program and expected to be replaced in next 3 to 5yrs. currently a consultant has been engaged to conduct research on raw water quality in winter and summer. A different consultant has been working on the design and feasibility study on Community waste management. A new site is anticipated within 3 years. The municipality has be conducting sampling of raw water, treated water, wastewater effluent and leachate on annual basis. Their annual reporting program is up to date. ᐊᐅᓚᑦᓯᔨᓖᙶᖅᑐᑦ ᓇᐃᓪᓕᑎᖅᓯᒪᔪᑦ ᓄᓇᓕᖏᓐᓄᑦ ᑲᖏᖅᑐᒑᐱᐅᑉ; ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯ #3BM-CLY 1419; Type-B. ᑲᖏᖅᑐᒑᐱᒃ ᐃᓄᓐᓄᑦ ᓄᓇᓕᒋᔭᑐᖃᐅᕗᑦ ᐃᓄᖃᖅᓱᓂ ᒥᑦᓵᓃᑦᑐᓂᒃ 1031 ᐃᓂᖃᖅᓱᓂ ᓯᓈᖓᓂ ᕿᑭᖅᑖᓘᑉ ᐸᑐᕆᓴ ᑲᖏᖅᓱᖓᓂ, ᑲᖏᖅᑐᒑᐱᐅᑉ ᑲᖏᖅᓱᖓᓂ, ᐃᓚᒋᔭᐅᓪᓗᓂ ᕿᑭᖅᑖᓘᑉ ᐊᑯᑭᑦᑐᓪᓗ ᐃᑭᕋᓴᖓᓄᑦ ᕿᑭᖅᑖᓗᒻᒥ ᓄᓇᕗᒻᒥ. ᐃᓂᖃᖅᑐᖅ ᕿᑭᖅᑖᓗᒻᒥ ᐃᓐᓈᕈᓕᒻᒥ, ᐃᓚᒋᔭᐅᓪᓗᑎᒃ ᐅᑭᐅᖅᑕᖅᑐᒥ ᑯᐊᑎᓗᕋ ᐃᓐᓈᕈᖏᓐᓄᑦ. ᖃᐅᔨᒪᔭᐅᔪᖅ “ᐊᖅᑯᑎ ᑲᖏᖅᓱᓄᑦ”, ᑲᖏᖅᑐᒑᐱᒃ ᐃᓂᖃᖅᑐᖅ ᒪᓂᖅᑲᒥ, ᐊᕙᓗᔭᐅᒪᑦᓱᓂ ᑲᔾᔮᓇᖅᑐᒻᒪᕆᓐᓄᑦ ᑲᖏᖅᓱᓄᑦ ᑎᑭᐅᑎᓯᒪᔪᓄᑦ ᕚᓐᔅ ᐊᐅᔪᐃᑦᑐᕐᒧᑦ. ᕼᐋᒻᒪᓚᒃᑯᖏᑦ ᑲᖏᖅᑐᒑᐱᐅᑉ ᓄᓇᓕᓕᐅᕗᑦ ᕿᑭᖅᑖᓗᒻᒥ ᐃᓂᖃᖅᓱᓂ ᓄᓇᙳᐊᑎᒍᑦ Latitude 70027’N ᐊᒻᒪᓗ Longitude 68033’W, ᓯᓈᖓᓂ ᐸᑐᕆᓴ ᑲᖏᖅᓱᖓᑕ, ᑲᓇᓐᓇᖅᐸᓯᖓᓂ ᓯᓈᖓᓂ ᕿᑭᖅᑖᓘᑉ. ᐊᕐᕌᒍᒥ ᐊᐱᕙᑦᑐᖅ ᒥᑦᓵᓃᑦᑐᓂᒃ 169cm ᐊᒻᒪᓗ ᐊᕐᕌᒍᒥ ᓯᓚᓗᑉᐸᑦᓱᓂ ᒥᑦᓵᓃᑦᑐᓂᒃ 5cm. ᕕᕗᐊᕆᒥ ᓯᓚ ᓂᓪᓚᓱᓐᓂᖃᕋᔪᖅᑐᖅ -30oc ᔪᓚᐃᒥ ᑎᑭᐅᒪᒐᔪᑦᓱᓂ ᐅᖅᑰᓂᖓ 50C−ᒧᑦ. ᖁᐊᖅᐸᓪᓕᐊᒐᔪᓯᓲᖅ ᑕᖅᑭᖓᓂ ᓅᕙᐃᕝᕙ ᑭᓯᐊᓂ ᖁᐊᖅᓴᕋᐃᒍᓐᓇᕐᒥᔪᖅ ᓯᑕᕝᕙᒥ ᐅᑦᑑᕝᕙᒥᓘᓐᓃᑦ, ᐅᐱᕐᖓᐸᓪᓕᐊᓯᒐᔪᑦᓱᓂ ᒪᐃ ᓄᙳᐊᓂ ᔫᓂᒥᓘᓐᓃᑦ. ᓄᓇᓕᓐᓂ ᐋᖅᑭᐅᒪᔾᔪᑏᑦ ᐱᖃᓯᐅᔾᔨᔪᑦ: (1) ᐃᒻᒥᖅᑐᐃᕕᒃ ᐃᒻᒥᐸᑦᑐᖅ ᑕᓯᕐᒥᒃ ᓴᓗᒻᒪᓴᖅᑕᐅᕙᑦᓱᓂ ᐃᒥᖅᑕᐅᑎᒧᑦ ᐃᒻᒥᖅᑐᐃᑯᒻᒥ ᓄᓇᓯᐅᑎᒃᑯᑦ ᐃᒻᒦᕙᑦᓱᑎᒃ ᐊᑐᓂᑦ ᐃᓪᓗᓂ ᐃᒪᖃᐅᑎᓂᒃ. (2) ᓄᓇᓖᑦ ᐊᑕᐅᓯᕐᒥᒃ ᑭᓈᓗᒻᒥᒃ ᑯᕕᖅᓴᕐᕕᓖᑦ ᒥᓪᓗᐊᖅᑕᐅᓯᒪᔪᓂᒃ ᐊᑐᓂᑦ ᐃᓪᓗᓂᒃ ᓄᓇᓕᓐᓂ. ᑭᓈᓗᒃ ᓴᓗᒪᕿᔭᐅᖅᑳᐸᑦᑐᖅ ᐊᓂᑕᐅᙱᓐᓂᖓᓂ ᒪᓴᓐᓂᖓᓄᑦ, ᑭᖑᕐᖓᒍᑦ ᒪᓴᒃᑰᓚᐅᖅᓱᓂ ᑕᕆᐅᕐᒨᓕᑕᐃᓐᓇᖅᓱᓂ. (3) ᑕᖏᓕᓐᓄᑦ ᐊᑦᑕᕐᕕᒃ ᐱᖃᓯᐅᔾᔨᔪᖅ ᓴᓂᓐᓂᒃ, ᓴᓇᔨᓃᙶᖅᑐᓂᒃ ᓴᓂᓐᓂᒃ, ᓴᕕᕋ.ᔭᓐᓂᒃ ᓱᕈᓐᓇᖅᑐᓂᓪᓗ. ᒫᓐᓇ ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯᖓᑦ #3BM-CLY 1419; Type B ᑐᓂᔭᐅᔪᔪᖅ ᔪᓚᐃ 25, 2014 ᐃᓱᓕᕝᕕᑦᓴᖃᖅᓱᓂ ᔪᓚᐃ 24, 2019. ᐊᓯᔾᔨᖅᓯᒪᔪᖃᙱᑦᑐᖅ ᐃᒥᕐᒧᑦ ᓚᐃᓴᓐᓯ ᑐᓂᔭᐅᓚᐅᖅᓯᒪᒻᒪᓂᑦ. ᓄᓇᓖᑦ ᐃᓄᖃᖅᑐᑦ 1031 ᒥᑦᓵᓂ 2019−ᒥ ᐊᐅᓚᓂᖃᖅᓯᒪᑦᓱᑎᓪᓗ ᑖᒃᑯᐊ ᓚᐃᓴᓐᓯᑖᖅᑎᑕᐅᓯᒪᔪᑦ ᐃᓪᓗᐃᑦ ᐱᕕᓕᒫᒃᑯᑦ. ᐃᒥᕐᒧᑦ ᐱᔪᓐᓇᐅᑎᓖᑦ 38,000 ᑭᑉᐹᕆᑦᑐᑦ ᒦᑕᐃᑦ ᐊᕐᕌᒍᑕᒫᑦ. ᐃᒻᒥᖅᑐᐃᕕᒃ ᐊᑖᓃᑦᑐᖅ ᐱᒻᒪᕆᐅᑏᑦ ᐊᐅᓚᔾᔪᑎᖏᑦᑕ ᓂᕆᐅᒋᔭᐅᑦᓱᓂᓗ ᐃᓇᖏᖅᑕᐅᒐᔭᕆᐊᖏᑦ ᐊᕐᕌᒍᓂ 3-5−ᓂ ᐊᒡᒋᖅᑐᓂ. ᒫᓐᓇ ᑐᑭᓯᓂᐊᖅᑎᒧᑦ ᑲᒪᒋᔭᐅᔪᑦ ᖃᐅᔨᓴᖅᑲᐅᑦᓱᓂ ᐃᒥᐅᑉ ᐱᐅᓂᖓ ᐅᑭᐅᒃᑯᑦ ᐊᐅᔭᒃᑯᓪᓗ. ᐊᓯᐊᓂᒃ ᑐᑭᓯᓂᐊᖅᑎᒥᒃ ᐱᓕᕆᔪᖃᖅᑐᖅ ᑎᑎᖅᑑᔭᖅᓯᒪᒪᓂᖓᓂᒃ ᑲᔪᓯᒍᓐᓇᕐᒪᖔᕐᓗ ᖃᐅᔨᕐᓴᓂᖅ ᓄᓇᓕᓐᓂ ᐊᑦᑕᑯᓂᒃ ᐊᐅᓚᑦᓯᓂᖅ. ᐊᑦᑕᕐᕕᑖᖅᑲᐅᒐᔭᕆᐊᖏᑦ ᓂᕆᐅᓇᖅᑐᖅ ᐊᕐᕌᒍᐃᑦ ᐱᖓᓱᑦ ᐃᓗᐊᓐᓂ. ᓄᓇᓖᑦ ᖃᐅᔨᓴᖏᓐᓇᕆᐊᓖᑦ ᐃᒥᕐᒥᒃ, ᓴᓗᒪᖅᑕᐅᓯᒪᔪᒥᒃ ᐃᒥᕐᒥᒃ, ᑯᕕᖅᓴᖅᑕᐅᔪᓂᓪᓗ ᐊᕐᕌᒍᑕᒫᑦ. ᐊᕐᕌᒍᑕᒫᑦ ᐅᓂᒃᑳᓕᐅᖃᑦᑕᕆᐊᖃᕐᓂᖓ ᐅᓪᓗᒥᒧᑦ ᑲᔪᓯᑦᓯᐊᖅᓯᒪᔪᖅ.
Personnel:
Persons: 20
Days: 3650
Project Map
List of all project geometries:
ID Geometry Location Name
5000 point New project geometry
Planning Regions:
Kivalliq
Affected Areas and Land Types
Municipal
Settlement Area
North Baffin Planning Region
Project Land Use and Authorizations
Project Land Use
All-Weather Road Access
Licensing Agencies
NWB: Type B Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Heavy equipment 3 Heavy Excavation and land leveling
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 50 200 Liters operating heavy equipment
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Batteries 2 5 Metric Tons disposal
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
299 pumping Lake
Waste and Impacts
Environmental Impacts
No impact
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Sewage (human waste) Unknown Sludge remains at the lagoon bed. paper and woods are burned. Hazardous wastes are packed for ship out. Trucking
Category: Application related document - Conformity Determination Letter
Recieved: 2019-04-26
Originator: Goump Djalogue
Public Registry ID: 16299
Document Size: 770.97 Kb
Category: Application related document - Generic Review Letter
Recieved: 2019-04-26
Originator: Goump Djalogue
Public Registry ID: 16298
Document Size: 84.01 Kb

NORTH BAFFIN QUESTIONAIRE

GENERAL
Environmental Protection:
s3.13.8: The applicant undertakes to prevent any new occurrences of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s3.13.8: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s3.13.1 and Appendix H, s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low-Level Air Flights:
Appendix H, s3: Will the applicant avoid all low-level flights?
YES

Caribou Protection Measures:
s3.3.7 and Appendix D: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix D?
YES

Caribou Water Crossings:
s3.3.7 and map: Will the applicant avoid, between may 15 and September 1, to construct any camp, cache any fuel or conduct any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

Polar Bear Denning Areas and Walrus Haul-outs:
s3.3.8: Will the applicant keep its activities away from any polar bear denning area or walrus haul-out?
YES

HERITAGE RESOURCES
Reporting of Archaeological Sites:
s3.11.3 and Appendix H, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Department of Culture, Language, Elders and Youth (GN)?
YES