Renewal and Amendment Water Licence # 1BW-DUV1520 of the Hamlet of Pangnirtung for 5 (five) years term (149233)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Bhabesh Roy
Company: GN-CGS
Schedule:
Start Date: 2020-06-09
End Date: 2025-06-08
Operation Type: Annual
Project Description:
Executive Summary of the Hamlet of Pangnirtung Duval River Water Licence # 1BW-DUV 1520. The Hamlet of Pangnirtung is located at Latitude 66009’00”N and Longitude 65040’34”W on the Eastern shore of Baffin Island. The population of this community in 1019 is 1,634. Duval River divides this community into two sections. These two sections are connected by a steel bridge built over the river. This is a single lane bridge. The Duval River crossing and associated drainage redirection structure was constructed in October 2009 by Fisheries and Oceans Canada to facilitate the construction of the Pangnirtung Small Craft Harbour Project. This crossing is located at Latitude 6909’2.87’’ and Longitude 65041’30.01”. The Duval River crossing consists of metal culverts and rock fill. This crossing is required for transportation of the heavy equipment. Construction of the Harbour was completed in September 2013. This facility was handed over to the Hamlet since they needed. The Hamlet of Pangnirtung will continue to use the Duval River crossing to access the municipal quarry. This process will reduce the traffic jam on the steel bridge next to this crossing and also minimize heavy loading on the bridge as well. Considering this benefit, a decision was made to keep the crossing active and transferred the Licence # 1BW-DUV 1214 to the Hamlet of Pangnirtung on April 24, 2014. The Hamlet of Pangnirtung will be monitoring erosion status upstream and downstream of this crossing. Hamlet also monitors surface water quality in summer to satisfy the requirements of the water licence. Since Hamlet is the beneficiary and licensee of this facility, they will be looking after the operation and maintenance of this facility. The Hamlet conducts summer sampling and submits annual report on time. Therefore, a 5 (five) year term for renewal of the licence is recommended. The time period of five year is expected to provide a realistic opportunity for the licensee to meet the long term requirements of the Licence and establish a consistent compliance record. ᐊᐅᓚᑦᑎᔨᓂᒃ ᓇᐃᓈᖅᓯᒪᔪᖅ ᐸᖕᓂᖅᑑᒥ ᕼᐋᒻᒪᓚᒃᑯᑦ Duval ᑰᖕᒥ ᐃᒪᕐᒧᑦ ᐱᔪᓐᓇᐅᑎ # 1BW-DUV 1520. ᕼᐋᒻᒪᓚᒃᑯᑦ ᐸᖕᓂᖅᑑᒥ ᐃᓂᖃᖅᑐᖅ ᓴᓂᒧᑦ 66009’00”N ᐊᒻᒪ ᑐᑭᒧᑦ 65040’34”W ᕿᑭᖅᑖᓘᑉ ᑲᓇᖕᓇᖅᐸᓯᐊᓂ. ᓄᓇᖅᑲᑎᒌᑦ ᐃᓄᒋᐊᒃᑎᒋᕗᑦ 1,634 2019-ᒥ. Duval River ᑰᒃ ᓄᓇᓖᒃ ᐊᕕᒃᓯᒪᔾᔪᑎᒋᕚ ᒪᕐᕉᓕᖅᑲᖓᔪᒥᒃ. ᑖᒃᑯᐊ ᓄᓇᓖᑦ ᒪᕐᕉᓕᖅᑲᖓᔪᑦ ᐊᒃᑐᐊᓂᖃᖅᐳᑦ ᓴᕕᕋᔮᓗᖕᒥ ᑰᑉ ᖁᓛᒍᑦ ᐃᑳᕕᖕᒧᑦ. ᐃᑳᕐᕕᒃ ᑐᐊᑦᑑᓪᓗᓂ. Duval River ᑰᒃ ᐃᑳᕐᕕᒃ ᐊᒃᑐᐊᓂᓖᓪᓗ ᑰᒡᕕᖕᒧᑦ ᓴᓇᔭᐅᓚᐅᖅᓯᒪᔪᖅ ᐅᑐᐱᕆ 2009−ᒥ ᐃᒪᕐᒥᐅᑕᓕᕆᔨᒃᑯᑦ ᑲᓇᑕᒥ ᐊᐅᓚᑦᑎᖁᔭᐅᓪᓗᑎᒃ ᓴᓇᔭᐅᔪᒥᒃ ᐸᖕᓂᖅᑑᒥ ᖃᔭᕆᐊᒃᑯᕕᖕᒧᑦ ᐱᓕᕆᐊᒧᑦ. ᑖᓐᓇ ᐃᑳᕐᕕᒃ ᐃᓂᖃᖅᑐᖅ ᓴᓂᒧᑦ 6909’2.87’’ ᐊᒻᒪ ᑐᑭᒧᑦ 65041’30.01”. Duval RIver-ᒧᑦ ᐃᑳᕐᕕᒃ ᓴᓇᓯᒪᔪᖅ ᓴᕕᕋᔭᖕᓂ ᑐᙵᕕᖃᖅᖢᓂ ᐊᒻᒪ ᐅᔭᖅᑲᓄᑦ ᐊᐅᓚᔾᔭᐃᒃᑯᓯᖅᓯᒪᓪᓗᓂ. ᐃᑳᕐᕕᖃᕆᐊᖃᖅᑐᑦ ᓅᑦᑕᕆᐊᖃᖃᑦᑕᕐᓂᖏᓐᓄᑦ ᐅᖁᒪᐃᑦᑐᑦ ᐱᖁᑎᑦ. ᐃᒃᓴᕐᕕᒃ ᓴᓇᔭᐅᕌᓂᓚᐅᖅᓯᒪᕗᖅ ᓯᑎᐱᕆ 2013-ᒥ. ᐃᒃᓴᕐᕕᒃ ᑐᓐᓂᖅᑯᑕᐅᓚᐅᖅᓯᒪᕗᖅ ᕼᐋᒻᒪᓚᒃᑯᓐᓄᑦ ᐱᑖᕆᐊᖃᕐᓂᖏᓐᓄᑦ. ᕼᐋᒻᒪᓚᒃᑯᑦ ᐸᖕᓂᖅᑑᒥ ᐊᑐᐃᓐᓇᕐᓂᐊᖅᑐᑦ Duval River ᑰᖕᒧᑦ ᐃᑳᕐᕕᖕᒥ ᕼᐋᒻᒪᓚᒃᑯᑦ ᑐᐊᐸᒃᑕᕆᐊᖃᖃᑦᑕᕐᓂᖏᓐᓄᑦ. ᑖᓐᓇ ᐱᓕᕆᐊᖅ ᓄᓇᓯᐅᑎᑦ ᐅᓄᖅᓯᓗᐊᖁᓇᒋᑦ ᓴᕕᕋᔭᒃ ᐃᑳᕐᕕᖕᒥ ᐃᑳᕐᕕᐅᑉ ᖃᓂᒋᔮᓂ ᒥᒃᖠᒋᐊᕈᑕᐅᓗᓂᓗ ᐅᖁᒪᐃᑦᑐᓂᒃ ᐃᑳᕐᕕᒃᑰᖃᑦᑕᙱᓐᓂᖅᓴᐅᓗᑎᒃ. ᐃᓱᒪᒋᓪᓗᒋᑦ ᑖᒃᑯᐊ ᐃᑲᔫᑎᑦ, ᐃᓱᒪᓕᐅᕆᔪᖃᓚᐅᖅᑐᖅ ᐃᑳᕐᕕᒃ ᐊᑐᖅᑕᐅᖏᓐᓇᖁᓪᓗᒍ ᓅᑕᐅᓪᓗᓂᓗ ᐱᔪᓐᓇᐅᑎ # 1BW-DUV 1214 ᕼᐋᒻᒪᓚᒃᑯᑦ ᐸᖕᓂᖅᑑᒧᑦ ᐊᐃᕆᓕ 24, 2014−ᒥ. ᕼᐋᒻᒪᓚᒃᑯᑦ ᐸᖕᓂᖅᑑᒥ ᖃᐅᔨᓴᖃᑦᑕᕐᓂᐊᖅᑐᑦ ᓄᓇᐅᑉ ᓄᖑᑕᒃᐸᓪᓕᐊᓂᖓᓂ ᑰᑉ ᐊᑯᐊᓂ ᐊᒻᒪ ᐃᑳᕐᕕᖕᒥ. ᕼᐋᒻᒪᓚᒃᑯᑦ ᖃᐅᔨᓴᓲᖑᖕᒥᔪᑦ ᐃᒪᐅᑉ ᖄᖓᓃᑦᑐᖅ ᐱᐅᓂᖓᓂ ᐊᐅᔭᐅᓕᕌᖓᑦ ᓈᒻᒪᒃᑐᒦᑎᓐᓇᓱᒃᖢᒍ ᐃᒪᕐᒧᑦ ᐱᔪᓐᓇᐅᑎᒧᑦ. ᕼᐋᒻᒪᓚᒃᑯᑦ ᐃᑳᕐᕕᖕᒧᑦ ᐱᔪᓐᓇᐅᑎᖃᕐᓂᖏᓐᓄᑦ, ᐊᐅᓚᑦᑎᔾᔪᑎᖏᓐᓂᒃ ᐋᖅᑭᐅᒪᔾᔪᑎᖏᓐᓂᒡᓗ ᑲᒪᔨᐅᓂᐊᖅᑐᑦ ᐃᑳᕐᕕᖕᒧᑦ. ᕼᐋᒻᒪᓚᒃᑯᑦ ᐊᐅᔭᒃᑯᑦ ᖃᐅᔨᓴᓲᖑᕗᑦ ᐊᕐᕌᒍᓕᒫᖅᓯᐅᒻᒥᒡᓗ ᐅᓂᒃ ᑳᖄᓕᐅᖅᐸᒃᖢᑎᒃ ᓈᒻᒪᖅᑰᑦᑎᓪᓗᑎᒃ. ᑕᐃᒪᐃᓐᓂᖓᓄᑦ, ᐅᑭᐅᓄᑦ ᑕᓪᓕᒪᓄᑦ ᓄᑖᙳᕆᐊᖅᑕᐅᖃᑦᑕᕆᐊᖃᖅᑐᖅ ᐃᒪᕐᒧᑦ ᐱᔪᓐᓇᐅᑦ. ᐊᑯᓂᐅᓂᖓ ᐅᑭᐅᓄᑦ ᑕᓪᓕᒪᓄᑦ ᐱᑎᑦᑎᓇᔭᖅᑐᖅ ᑐᑭᖃᑦᑎᐊᖅᑐᒥᒃ ᐱᕕᒃᓴᒥᒃ ᐱᔪᓐᓇᐅᑎᖃᖅᑎᑦᑎᔨᒧᑦ ᓇᓗᓇᐃᕆᓗᓂ ᐊᔪᙱᓐᓂᖓᓂᒃ ᐊᑯᓂᐅᔪᒃᑯᑦ ᐱᔭᕆᐊᓕᖕᓂᑦ ᐱᔪᓐᓇᐅᑎᒥᒃ ᐋᖅᑭᒃᓯᓗᑎᒃᓗ ᒪᓕᑦᑎᐊᖅᑐᓂᒃ ᒪᓕᒋᐊᓕᖏᓐᓂ ᐅᓂᒃᑳᓂᑦ.
Personnel:
Persons: 1
Days: 1825
Project Map
List of all project geometries:
ID Geometry Location Name
5835 point New project geometry
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
All-Weather Road Access
Licensing Agencies
NWB: Type B Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Heavy 1 Not Known Only summer for 6 months only
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 10 200 Liters Consider two drums a year, 10 drums in 5 years.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
not applicable 0 200 Liters no use
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
538 pumping ( for 90 days only) Duval River itself
Waste and Impacts
Environmental Impacts
No Impact
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Hazardous waste 0 0 0
Category: Application related document - Conformity Determination Letter
Recieved: 2019-12-20
Originator: Goump Djalogue
Public Registry ID: 17123
Document Size: 257.01 Kb
2019-09-15 17:17:49, from: Bhabesh Roy
 The executive summary in English and Inuktitut are attached. This is an application for the renewal and amendment of the Pangnirtung Duval River Water Licence Type B for 5 (five) years term effecting from June 09,2020.

2019-12-19 15:21:01, from: Goump Djalogue