Project Dashboard

Establishment of a Modular Home Factory in Cambridge Bay, Nunavut (149247)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Cynthia
Company: Illu Consulting and Development Services
Schedule:
Start Date: 2021-04-01
End Date: 2040-12-31
Operation Type: Annual
Project Description:
Project Description Illu Consulting and Development Service (ICDS) is proposing to establish a manufacturing facility/building (NUNAFAB) where prefab home units can be built for Cambridge Bay and nearby communities. NUNAFAB will be located within the municipality of Cambridge Bay and the enclosed building will allow workers to build homes year-round because the work is in an enclosed facility. These home units will be designed and built so they can be assembled on lots into detached single homes or multi-unit apartments. Scope of Activities ▪ Construction of a 30,000 square foot facility to include warehouse for material storage, office space, and product development laboratory for R&D activities ▪ Installation and commissioning of a few production line machinery and technologies ▪ Year-round production of home units with complete electrical, mechanical, plumbing and structural components ▪ Undertake in-house testing of different building components and training of apprentices Duration of Project • Construction of factory is expected to be completed by December 2020. Factory operation is anticipated to begin in early 2021.
Personnel:
Persons: 8
Days: 90
Project Map
List of all project geometries:
ID Geometry Location Name
5889 point New project geometry
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Other
Temporary Structures
Licensing Agencies
No data found.
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
No records found.
Fuel Use
Type Container(s) Capacity UOM Use
No records found.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
• No major environmental impacts are expected during the construction and operational phases of the factory except for the generation of construction wastes, mainly wooden materials that will be disposed in the landfill. • Proposed project does not require special water use or fuel storage. Proper waste management protocol to be developed and implemented during construction and operation phase of the factory.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - Project description
Recieved: 2019-10-28
Originator: Cynthia
Public Registry ID: 16937
Document Size: 69.65 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2019-10-31
Originator: Peter Scholz
Public Registry ID: 16960
Document Size: 522.6 Kb