Community Fire Hall (149258)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Alexandre Godin
Company: Kudlik Construction Ltd.
Schedule:
Start Date: 2020-06-01
End Date: 2020-11-30
Operation Type: Annual
Project Description:
For this design-built project Kudlik Construction chosen a prefabricated (Behlen) non-combustible design for both these fire halls. Exterior envelop consist of pre-insulated panels. On the interior; a mezzanine, an office, a bathroom and a meeting room will be built. On the main floor; a second bathroom, mechanical, generator room + 3 storage rooms will be present This new building will be build right beside the existing Kugaaruk fire hall and will be operational by the end of November 2020. This permit application is to allow us to pump 100cu.m of water from the Kugajuk river to produce our concrete on site. The water will be haul by truck and heavy equipment in 1cu.m reservoirs, on the road from the pumping point to the construction site. Not more than 20cu.m. will be pump per day.
Personnel:
Persons: 15
Days: 182
Project Map
List of all project geometries:
ID Geometry Location Name
5942 point The hose will be install at this point on the shore of this small bay to pump the water on a reservoir localize on the edge of the road
5943 point Localization of the 1cu.m reservoir along the road
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Other
Licensing Agencies
NWB: Approval to Use Water/Deposit Water Without a Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
water pump 1 0,3m x 03.m x 0.9m water sump pump with 2'' diameter hose.
Water Reservoir 1 1.2m x 1.2m x 1.2m water plastique reservoir of 1cu.m capacity.
pick up truck 1 6.6m x 2.2m x 2.1m to haul the water reservoir from the road to the construction site in town and/or just to manage the operation
Loader 1 8.5m x 3.5m x 3m WA500 Komatsu loader, to haul the water reservoir from the road to the construction site.
Generator 1 0.6m x 0.6m x 0.6m Generator Yamaha 7200W to supply the power to the water pump
Quadrex bag 1 1,1m x 1,1m x 1,1m Quadrex bag use to put the generator inside this one.
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 1 5 Gallons To fill the generator on the edge of the road 2x per day
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
20 water pumping from the river shore to the 1cu.m reservoir with a 50mm diam. hose As per drawing submitted
Waste and Impacts
Environmental Impacts
As the operation is limited to water pumpimp with a sump pump, no waste are anticipated. To protect the area around the water pump, this one will be install in a protective casing. This will avoid to pump solid particules. The generator localise on the edge of the road will be set in a pan to avoid any leaking from this one during the pumping operation.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Combustible wastes None or less than 1L. None Use absorbant and absorbant sheets to clean the bottom of the pan if a leak occur from the generator during the pumping operation. Those sheets will be store in a properly container and ship to South to be processed.
Category: Application form attachment - Equipment
Recieved: 2019-12-04
Originator: Alexandre Godin
Public Registry ID: 17050
Document Size: 7195.93 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2019-12-05
Originator: Peter Scholz
Public Registry ID: 17055
Document Size: 517.77 Kb
2019-12-04 10:38:02, from: Alexandre Godin
 Here is our application form to pump water from the Kugajuk River next spring. The purpose is to pump 100cu.m and haul it on our construction site. A maximum of 20cu.m/day will be pump. If any other authorization are require before this present application please just let me know, to include this/those in the process. If you have any questions or concern fill free to reach me at any time. Regards, Alexandre Godin, P. Eng., Project Manager, Kudlik Construction Ltd. Cell; (418) 806-6404

2019-12-04 15:05:26, from: Peter Scholz
 Hello, do you know what class of water license you will be applying for?