Project Dashboard

Baralzon Lake Camp (149322)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Ryan St. John
Company: Henik Lake Adventures Ltd.
Schedule:
Start Date: 2020-06-30
End Date: 2040-08-30
Operation Type: Seasonal
Project Description:
Land use application for outfitting and expediting services
Personnel:
Persons: 8
Days: 30
Project Map
List of all project geometries:
ID Geometry Location Name
6186 point New project geometry
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Tourism Activities
Tourism Activities
Licensing Agencies
INAC: Class B Land Use Permit
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
float aircraft to access camp 1 Turbo otter 8 seat turbo otter
Fuel Use
Type Container(s) Capacity UOM Use
No records found.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0.75 Pump from lake into 300 gallon holding tank Lake next to camp
Waste and Impacts
Environmental Impacts
Minimal impact to land and water
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Greywater minimal none Sewage will be buried in pits and treated with lime. Garage: will be burned on site in barrel. non-burnables will be taken back to Arviat and disposed of at community dump.
Category: Imported geometry - proect geometry
Recieved: 2020-03-02
Originator: Ryan St. John
Public Registry ID: 17500
Document Size: 493.64 Kb
Category: Imported geometry - proect geometry
Recieved: 2020-03-02
Originator: Ryan St. John
Public Registry ID: 17501
Document Size: 493.64 Kb
Category: Application form attachment - Project description
Recieved: 2020-03-03
Originator: Ryan St. John
Public Registry ID: 17503
Document Size: 493.64 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2020-03-26
Originator: Peter Scholz
Public Registry ID: 17615
Document Size: 567.7 Kb

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
NO

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
NO
i. If not, explain why such flights are or may be absolutely necessary.
null
ii. If such flights are or may be absolutely necessary, will they avoid disturbance to people and wildlife?
YES
iii. If not, explain why it is not possible to avoid such disturbance.

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES