Project Dashboard

Edehon Lake Camp (149325)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Ryan St. John
Company: Henik Lake Adventures Ltd.
Schedule:
Start Date: 2020-06-30
End Date: 2040-06-30
Operation Type: Annual
Project Description:
Land use permit application for outfitting and expediting services
Personnel:
Persons: 8
Days: 30
Project Map
List of all project geometries:
ID Geometry Location Name
6188 point New project geometry
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Tourism Activities
Licensing Agencies
INAC: Class B Land Use Permit
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Turbo otter and boats 4 various Use of Turbo otter to access site. Boats are used to access lake.
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 3 205 Liters 5 x 100lb propane on site as well.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
00 0 0 Cubic ft 00
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0.75 pump from lake into holding tank lake next to camp
Waste and Impacts
Environmental Impacts
Minimal environmental impact, see application for details.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - License/ Authorization
Recieved: 2020-03-03
Originator: Ryan St. John
Public Registry ID: 17504
Document Size: 407.47 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2020-03-26
Originator: Peter Scholz
Public Registry ID: 17616
Document Size: 567.7 Kb

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
NO
i. If not, explain why such flights are or may be absolutely necessary.
null
ii. If such flights are or may be absolutely necessary, will they avoid disturbance to people and wildlife?
YES
iii. If not, explain why it is not possible to avoid such disturbance.
null

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES