Project Dashboard

3AM-GRA1624 Municipal Water Licence Amendment (149381)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Connor Faulkner
Company: Government of Nunavut
Schedule:
Start Date: 2020-12-31
End Date: 2030-12-31
Operation Type: Annual
Project Description:
Application being submitted by the Government of Nunavut - CGS for amendment of water licence 3AM-GRA1624. All previous information submitted for this water licence remains the same, except: the pump from Char River has been moved into Lower Landing Lake for pumping into Nipissar Lake during the open water season (approved in the summer of 2018 on an emergency basis).
Personnel:
Persons: 3
Days: 365
Project Map
List of all project geometries:
ID Geometry Location Name
6397 point Rankin Inlet
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Municipal
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Other
Licensing Agencies
NWB: Type A Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Pumps N/A N/A Pumps used to draw raw water from raw water sources into water treatment plant for chlorination/disinfection, then moved into utilidor delivery system and discharge arm for filling of the water truck.
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 0 0 Liters Fuel used to heat the water treatment plant. *Container capacity unknown*
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Chlorine 0 0 Lbs Chlorine used for disinfection of RAW water at the water treatment plant. *Container capacity unknown*
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
2300 Pump Landing Lake/Nipissar Lake
Waste and Impacts
Environmental Impacts
Release of treated sewage effluent and greywater into Hudson Bay.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Greywater N/A Removal of large particles by mechanical augers. Effluent treated at wastewater treatment plant.
Sewage (human waste) N/A Removal of large particles by mechanical augers. Effluent treated at wastewater treatment plant.
Category: Application form attachment - License/ Authorization
Recieved: 2020-07-20
Originator: Connor Faulkner
Public Registry ID: 17902
Document Size: 411.14 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2020-07-20
Originator: Connor Faulkner
Public Registry ID: 17903
Document Size: 81.09 Kb
Category: Application form attachment - Project description
Recieved: 2020-07-20
Originator: Connor Faulkner
Public Registry ID: 17904
Document Size: 511.99 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2020-07-29
Originator: Goump Djalogue
Public Registry ID: 17921
Document Size: 222.1 Kb
2020-07-20 15:48:52, from: Connor Faulkner
 Call with Goump Djalogue on Monday July 20th regarding the application process for the renewal/amendment of Kivalliq municipal water licences.

2020-07-20 15:49:02, from: Connor Faulkner
 No previous NPC land conformity could be located due to the online system startup in 2016. Confirmed with Goump Djalogue on July 20th, 2020.

2020-07-24 10:09:46, from: Goump Djalogue
 Hi Connor, As discussed, please update the porject dates according to the type of license. e.g. 5 year for Type B License, and 10 year for Type A licenses. Also , revise the answer to the Low flight question to Yes. Thank you, Goump

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
YES

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES