Project Dashboard

3BM-WHA1520 Municipal Water Licence Renewal (149386)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Jeani
Company: Hamlet of Whale Cove
Schedule:
Start Date: 2020-12-31
End Date: 2025-12-31
Operation Type: Annual
Project Description:
Application being submitted by the Government of Nunavut - CGS on behalf of the Hamlet of Whale Cove for renewal of water licence 3BM-WHA1520. All previous information submitted for this water licence remains the same, except: seasonal use of a temporary water treatment facility (Filterboxx) to combat the high total coliform counts found within the treated water source. There are also future plans to expand or move the solid waste disposal facility which documentation and correspondence will be provided when available.
Personnel:
Persons: 1
Days: 365
Project Map
List of all project geometries:
ID Geometry Location Name
6402 point Whale Cove
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Municipal
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Other
Licensing Agencies
NWB: Type B Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Pumps N/A N/A Pumps used to draw raw water from source into water treatment plant for chlorination/disinfection, then moved into discharge arm for filling of the water trucks.
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 0 0 Liters Fuel used to heat the water treatment plant. *Container capacity unknown*
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Chlorine 0 0 Lbs Chlorine used for disinfection of RAW water at the water treatment plant. *Container capacity unknown*
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
299 Pump Wilson Watershed
Waste and Impacts
Environmental Impacts
Release of raw sewage and greywater into a sewage lagoon for settling, and release of effluent into a wetland for treatment before discharge into the Hudson Bay. Combustible, hazardous, and non-combustible waste leaching into the environment if bermed areas or fencing fails to uphold.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Combustible wastes N/A Bermed area to prevent leaching. Storage in sea cans or crates at the hazardous materials waste site or designated location within the solid waste site.
Greywater N/A Wetland. Sewage truck release into lagoon.
Hazardous waste N/A Bermed area to prevent leaching. Storage in sea cans or crates at the hazardous materials waste site or designated location within the solid waste site.
Non-Combustible wastes N/A Bermed area to prevent leaching and fencing to prevent waste from blowing into the environment. Garbage truck dump into the solid waste site.
Sewage (human waste) N/A Wetland. Sewage truck release into lagoon.
Category: Application form attachment - Other document
Recieved: 2020-07-22
Originator: Goump Djalogue
Public Registry ID: 17907
Document Size: 80.6 Kb
Category: Application form attachment - Other document
Recieved: 2020-07-22
Originator: Goump Djalogue
Public Registry ID: 17908
Document Size: 411.44 Kb
Category: Application form attachment - Other document
Recieved: 2020-07-22
Originator: Goump Djalogue
Public Registry ID: 17909
Document Size: 383.8 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2020-07-29
Originator: Goump Djalogue
Public Registry ID: 17923
Document Size: 222.66 Kb
2020-07-20 15:35:10, from: Connor Faulkner
 Call with Goump Djalogue on Monday July 20th regarding the application process for the renewal/amendment of Kivalliq municipal water licences.

2020-07-20 15:36:10, from: Connor Faulkner
 No previous NPC land conformity could be located due to the online system startup in 2016. Confirmed with Goump Djalogue on July 20th, 2020.

2020-07-24 10:09:17, from: Goump Djalogue
 Hi Connor, As discussed, please update the porject dates according to the type of license. e.g. 5 year for Type B License, and 10 year for Type A licenses. Also , revise the answer to the Low flight question to Yes. Thank you, Goump

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
YES

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES