Project Dashboard

Nunagold Henik-Arviat Project (149392)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Paul Sobie
Company: MPH Consulting Limited
Schedule:
Start Date: 2020-08-01
End Date: 2021-10-30
Operation Type: Annual
Project Description:
Airborne electromagnetic surveying over five flight blocks, with concurrent geological prospecting carried out on known mineral occurrences within the Henik Lake, Turquetil Lake, Kinga Lake, Happy Lake and Maguse Lake areas. The Project Camp for the prospecting will be the Henik Lake Camp of Eskimo Point Lumber Supply/Airport Services Ltd. , who will also be managing all expediting out of Arviat. The airborne surveying will be based out of Arviat and/or Rankin Inlet
Personnel:
Persons: 12
Days: 60
Project Map
List of all project geometries:
ID Geometry Location Name
6415 polygon Turquetil
6416 polygon Kinga
6417 polygon Henik
6418 polygon Happy Lake
6419 polygon Maguse
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Inuit Owned Surface Lands
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Licensing Agencies
KivIA: Land Use Licence I
INAC: 0
NTI: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Helicopter 1 Bell 206 LR Helicopter will be used to move the geological crew to prospecting sites from Henik Lake Camp + occasional trips to Arviat.
Fixed-Wing Aircraft 1 tbd Fixed-wing aircraft will carry out the airborne survey work from Arviat
Fuel Use
Type Container(s) Capacity UOM Use
Aviation fuel 120 45 Gallons Helicopter fuel for ferrying geological crews to prospecting sites, and for occasional supply trips to Arviat
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
none 0 0 Liters n/a
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0 n/a n/a
Waste and Impacts
Environmental Impacts
n/a
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Imported geometry - proect geometry
Recieved: 2020-06-30
Originator: Paul Sobie
Public Registry ID: 17869
Document Size: 4.44 Kb
Category: Application form attachment - Project description
Recieved: 2020-06-30
Originator: Paul Sobie
Public Registry ID: 17870
Document Size: 2329.72 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2020-07-07
Originator: Peter Scholz
Public Registry ID: 17873
Document Size: 258.38 Kb
2020-07-03 06:07:30, from: Peter Scholz
 Are you aware of other authoizations you will be requiring? Thanks

2020-07-03 09:17:54, from: Paul Sobie
 Yes a KIA Land Use Licence will also be required for the project

2020-07-03 19:54:55, from: Peter Scholz
 Can you please confirm if you need any authorizations from the land owners before you proceed with this project? If so please list them under "Authorizing Agencies". Thanks.

2020-07-03 20:07:51, from: Paul Sobie
 Right Peter - really only John Tugak (and his daughter Corinne) is a significant land owner and he is our partner on the Turquetil MEA (known as Huckleberry 0002). We are flying and prospecting his other MEA's and claims as a due-diligence/assessment exercise to ascertain whether we'll also enter into agreements with the Tugaks on some or all of their properties

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES

Uranium Development and Mining:
s3.4.5, s3.4.6: Does the project proposal involve either uranium development or uranium mining?
NO


New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES