Proponent name: | Maurice Guimond |
Company: | Qulliq Energy Corporation |
Start Date: | 2024-02-01 |
End Date: | 2064-12-31 |
Operation Type: | Annual |
Persons: | 40 |
Days: | 600 |
ID | Geometry | Location Name |
---|---|---|
6922 | polygon | Lots 459 and 460 |
6923 | polygon | Lots 462 and 461 |
6924 | polygon | Solar - Option 1 |
Type | Quantity | Size | Use |
---|---|---|---|
Excavator | 1 | large | Perform civil work to prepare land for foundation |
Loader | 1 | Large | Perform moving of equipment and materials during construction of power plant |
Driller | 1 | 2m X 3m x3m | Drill piles for foundation of power plant |
Crane | 1 | tbd | Hoisting/lifting building materials and assist with construction at height |
Boom Truck | 1 | tbd | Transporting and lifting materials |
Dump Truck | 2 | tbd | Hauling materials to and from the construction site |
Backhoe | 1 | tbd | Material excavation |
Type | Container(s) | Capacity | UOM | Use |
---|---|---|---|---|
Diesel | 1 | 24000000 | Liters | Fuel Supply for power plant operation |
Diesel | 10 | 205 | Liters | Diesel for heavy equipment during construction. The construction contractor will be responsible for determining how much fuel will be stored onsite. |
Type | Container(s) | Capacity | UOM | Use |
---|---|---|---|---|
Ethylene Glycol | 1 | 2000 | Liters | Engine coolant when Power plant is operational |
Daily Amount (m3) | Retrieval Method | Retrieval Location |
---|---|---|
300 | To be determined by contractor during construction | To be determined by contractor during construction |
Waste Type | Quantity Generated | Treatement Method | Disposal Method |
---|---|---|---|
Non-Combustible wastes | 200L | None | ship south for disposal |
Overburden (organic soil, waste material, tailings) | 1 | Disposal of overburden and soil excavated for power plant to be determined by the contractor in communication with the Hamlet. Volume to be determined. | |
Hazardous waste | 1000L | None | Amount of liquid waste during operation will vary annually. Waste fuel/glycol will be collected in drums, stored within secondary containment and shipped south for disposal. |
Combustible wastes | Disposal of construction waste will be the responsibility of the contractor. If permitted by the Hamlet, some waste may be disposed of at the local landfill. | ||
Combustible wastes | During operations, QEC will dispose of domestic waste in the local landfill if permitted by the Hamlet. Waste that is not permitted in the local landfill will be shipped south as part of QECs annual waste shipment. |
Category: | Imported geometry - proect geometry |
Recieved: | 2019-01-15 |
Originator: | Maurice Guimond |
Public Registry ID: | 18023 |
Document Size: | 1.12 Kb |
Category: | Imported geometry - proect geometry |
Recieved: | 2020-10-27 |
Originator: | Megan Larose |
Public Registry ID: | 18025 |
Document Size: | 1.67 Kb |
Category: | Imported geometry - proect geometry |
Recieved: | 2020-10-27 |
Originator: | Megan Larose |
Public Registry ID: | 18026 |
Document Size: | 1.75 Kb |
Category: | Imported geometry - proect geometry |
Recieved: | 2020-10-27 |
Originator: | Megan Larose |
Public Registry ID: | 18027 |
Document Size: | 1.78 Kb |
Category: | Application form attachment - Project description |
Recieved: | 2020-10-27 |
Originator: | Megan Larose |
Public Registry ID: | 18028 |
Document Size: | 2150.02 Kb |
Category: | Application related document - Conformity Determination Letter |
Recieved: | 2019-01-27 |
Originator: | Peter Scholz |
Public Registry ID: | 18024 |
Document Size: | 221.19 Kb |