Project Dashboard

Kugluktuk Quarry Sites (Lot 572 and South of Airport) (149472)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Danny Zita
Company: Government of Nunavut
Schedule:
Start Date: 2021-02-03
End Date: 2031-02-03
Operation Type: Annual
Project Description:
Kugluktuk Quarry Site (South Side of the Airport) deposit is being explored by the Hamlet of Kugluktuk for the extraction of aggregate (fine gravel, sand etc..) to meet the construction demands of the community
Personnel:
Persons: 3
Days: 1500
Project Map
List of all project geometries:
ID Geometry Location Name
7061 polygon 501-SK-QUA-Site1
7094 polygon Lot 572 Plan 3925
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Pits and quarries
Pits and quarries
Licensing Agencies
NIRB: Screening Decision Report
CG&S: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Loader 1 5.7m x 2.7m excavate quarry material
Dump Truck 1 2.5mx3.4m Haul quarry material
Water Truck 1 10 tons Dust control
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 1 1 Liters Fuel will be provided by the Hamlet's facilities and supplies. There will be no storage of fuel on site.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
NA 1 0 Liters There will be no storage of hazardous material on site.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
Active creeks are not within the boundaries of the existing and proposed sites. Dust management will mitigate the effects of dust, silt, and fine sand. Excavation may expose underlying ice rich permafrost in surficial sand and gravel deposits. The Hamlet will manage drainage of pooling water by building ditches away from existing natural drainage and away from operation but within the boundaries of the site. There will be no discharge of water in the natural environment and into natural drainage paths. Vegetation will be removed from surface as the area will be excavated. Should an organic and root rich soil horizon be present, it will be stockpiled for use in reclamation of the pits.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Overburden (organic soil, waste material, tailings) 100000 none dump trucks
Category: Imported geometry - proect geometry
Recieved: 2021-02-11
Originator: Danny Zita
Public Registry ID: 18322
Document Size: 1.39 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-02-03
Originator: Danny Zita
Public Registry ID: 18296
Document Size: 151.69 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-02-03
Originator: Danny Zita
Public Registry ID: 18297
Document Size: 1.28 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-02-11
Originator: Danny Zita
Public Registry ID: 18321
Document Size: 151.69 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-02-22
Originator: Goump Djalogue
Public Registry ID: 18350
Document Size: 224.82 Kb
2021-02-08 12:54:41, from: Danny Zita
 Hello, I would like to modify this application to add a secondary quarry site to it.. Please advise on how I can do this. Thank you Danny Zita

2021-02-09 14:42:03, from: Goump Djalogue
 Per your request, I am returning the application for further edits. also please add to the list CGS as authorizing agency. Thanks