Project Dashboard

Peter and Fox Lakes exploration project, Renewal of the water licence 2BE-PTR1621 (149558)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: David Frenette
Company: Agnico Eagle Mines Ltd.
Schedule:
Start Date: 2021-10-31
End Date: 2031-10-30
Operation Type: Annual
Project Description:
The water licence 2BE-PTR1621 will expire in October 2021 and this application is for the renewal of the licence. Agnico Eagle Mines Ltd. is the owner of this mineral exploration project and has the responsibility for the management related to all authorizations required to conduct mineral exploration activities in the area. The exploration activities include geophysical surveys and diamond drilling.
Personnel:
Persons: 6
Days: 20
Project Map
List of all project geometries:
ID Geometry Location Name
7837 polygon 2BE-PTR1621_area
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Inuit Owned Surface Lands
Settlement Area
Keewatin Planning Region
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Mineral Exploration
Licensing Agencies
NIRB: Screening Decision Report
KivIA: Land Use Licence III
NWB: Type B Licence
INAC: Class A Land Use Permit
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Diamond drill 2 21500kg To obtain rock cores
Helicopter 2 Bell 407 Transport drill, material and workers
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 6 600 Liters For drilling
Aviation fuel 10 205 Liters For helicopter
Gasoline 4 25 Liters For small engine
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Hydraulic oil 4 25 Liters For the diamond drill
Motor oil 4 25 Liters For the diamond drill and pump
Glycol 4 25 Liters For the motors of the equipment on site
Grease 4 25 Liters For equipment maintenance
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
299 By pumping From proximal lakes and ponds
Waste and Impacts
Environmental Impacts
Exploration activities in this area are planned to be low scale and will generate minimal environmental impacts. With all conditions included within NIRB decision, CIRNAC permit, KIA land use licence, Nunavut Water Board water licence and Agnico Eagle internal management procedures, the impacts are mitigated.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Combustible wastes 200kg/year N/A Transport to the Meliadine mine site for treatment according to the waste management plan in place.
Hazardous waste 200 litres/year N/A Transport to the Meliadine mine site for segregation and then, transport in southern facility for safe recycling/disposal
Non-Combustible wastes 500kg/year N/A Transport to the Meliadine mine site for treatment according to the waste management in place
Category: Imported geometry - proect geometry
Recieved: 2021-05-17
Originator: David Frenette
Public Registry ID: 18703
Document Size: 5.25 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2021-05-19
Originator: David Frenette
Public Registry ID: 18709
Document Size: 320.96 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2021-05-19
Originator: David Frenette
Public Registry ID: 18711
Document Size: 24.44 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2021-05-19
Originator: David Frenette
Public Registry ID: 18712
Document Size: 4774.69 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2021-05-19
Originator: David Frenette
Public Registry ID: 18713
Document Size: 615.34 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-06-04
Originator: Goump Djalogue
Public Registry ID: 18737
Document Size: 260.37 Kb

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
NO
If yes, does the project proposal involve hydrocarbon exploration?
YES
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
NO

PARTICULAR ACTIVITIES

Uranium Development and Mining:
s3.4.5, s3.4.6: Does the project proposal involve either uranium development or uranium mining?
NO


New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES