Project Overview
Type of application: Amendment
Proponent name: Elan Chalmers
Company: Government of Nunavut
Schedule:
Start Date: 2021-04-24
End Date: 2031-04-23
Operation Type: Annual
Project Description:
This application is being submitted for the renewal of water licence 3BM-COR1521. All previous information submitted for this water licence remains the same however a Type A water licence will reflect that the community relies on a raw water reservoir that must be resupplied annually at a water pumping rate that exceeds the Type B licence limit of 300 cubic meters per day for 24 days during open water, to ensure there is sufficient water throughout the year. The previous Type B licence was based on consumption of daily treated water which is below 300 cubic meters per day. There are no changes to water operations in Coral Harbour but the withdrawal rate from Post River will be considered for the new licence rather than the treated water consumption rate. The water treatment plant included under the previous renewal/amendment was commissioned in 2016. The municipal water supply is drawn from Post River and consists of a movable water intake, overland pipeline, reservoir and water treatment plant. Sewage is deposited in a permeable lagoon from which effluent passively flows into a wetland treatment area. The solid waste site is a fenced and bermed area that accepts municipal, bulky metal and hazardous waste.
Summary of Modifications:
The Project Description has been modified to describe the reason that the licence application will be changed to a Type A licence from a Type B licence. The Water Use has been changed from daily rate of treated water consumption by Coral Harbour to daily rate of withdrawal from Post River during the 24 day raw water reservoir resupply.
Personnel:
Persons: 2
Days: 365
Project Map
List of all project geometries:
ID Geometry Location Name
7929 point Coral Harbour
Planning Regions:
Kitikmeot
Affected Areas and Land Types
Municipal
Settlement Area
Keewatin Planning Region
Southampton and Coats Island
Project Land Use and Authorizations
Project Land Use
Other
Licensing Agencies
NWB: Type B Licence
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Pump N/A N/A Pumps used to draw raw water from source into water reservoir for storage until moving to the treatment plant for chlorination/disinfection, then moved into discharge arm for filling of the water trucks.
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 1 0 Liters Fuel used to heat the water treatment plant. *Container capacity unknown*
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Chlorine 1 0 Liters Chlorine used for disinfection of RAW water at the water treatment plant. *Container capacity unknown
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
1800 Pump for 24 days Post River
Waste and Impacts
Environmental Impacts
Release of raw sewage and greywater into a sewage lagoon for settling, and release of effluent into a wetland for treatment before discharge into the Hudson Bay. Combustible, hazardous, and non-combustible waste leaching into the environment if bermed areas or fencing fails to uphold.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application form attachment - License/ Authorization
Recieved: 2021-04-13
Originator: Elan Chalmers
Public Registry ID: 18910
Document Size: 307.84 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-04-16
Originator: Solomon Amuno
Public Registry ID: 18911
Document Size: 252.45 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-08-11
Originator: Solomon Amuno
Public Registry ID: 18915
Document Size: 289.64 Kb

KEEWATIN QUESTIONAIRE

GENERAL
Environmental Protection:
s2.4.9: The applicant undertakes to prevent any new occurances of pollution, garbage and contamination at the site of the development.
YES

Removal of Fuel Drums:
s2.4.9: The applicant undertakes to remove all drums safely from the site and dispose of the drums in a safe manner.
YES

New Site Restoration and Clean Up:
s2.4.15 and Appendix 2,s1: The applicant undertakes to clean up the site and restore the site to its natural condition to the greatest extent possible.
YES

Old Site Restoration and Clean Up:
s3.13.2: The applicant undertakes to clean up the site and restore the site to its original condition to the greatest extent possible, including any work required due to the applicant's action prior to this application.
YES

Low Level Air Flights:
s5.4.4 and Apendix 2, s3: Will the applicant avoid low-level flights?
YES

Caribou Protection Measures:
s2.4.6 and Appendix 3: Will the applicant comply with the Caribou Protection Measures outlined in section 2.4.6 and in Appendix 3?
YES

Caribou Water Crossings:
Will the applicant avoid, between May 15 and September 1, to construct any camp, cache any fuel or conduct s2.4.6 and map: any blasting within 10 km of any Designated Caribou Water Crossing identified
YES

ARCHEOLOGY
Reporting of Archaeological Sites:
s4.4.3 and Appendix 3, s2 and s8: Will the applicant immediately report the discovery of all suspected archaeological sites to the Government of Nunavut?
YES

PARTICULAR AREAS
Game Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Thelon Game sanctuary?
NO

Bird Sanctuary:
s2.4.1: Is the project proposal located, in whole or in part, within the Mc Connell River Migratory Bird Sanctuary, the Harry Gibbons Migratory Bird Sanctuary or, the East Bay Migratory Bird Sanctuary
NO

Southern Southampton Island and Coats Island:
s3.4.5: Is the project proposal located, in whole or in part, in southern Southampton Island and Coats Island?
YES
If yes, does the project proposal involve hydrocarbon exploration?
NO
Municipal Lands:
s1.4.3: Is the project located, in whole or in part, within municipal boundaries?
YES

PARTICULAR ACTIVITIES



New Land Use:
Does the project proposal involve a new type of land use never engaged in before in the region?
NO

Code of Good Conduct for Land Users:
Appendix 2: The applicant undertakes to adhere to the Code of Good Conduct at all times.
YES