Taloyoak Quarry Sites (149593)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Danny Zita
Company: Government of Nunavut
Schedule:
Start Date: 2021-08-01
End Date: 2031-08-01
Operation Type: Annual
Project Description:
Taloyoak Quarry Sites on Lots 393,394,395,396,400 and 401 are being explored by the Hamlet for the extraction of aggregate (fine gravel, sand etc..) to meet the construction demands of the community.
Personnel:
Persons: 3
Days: 1500
Project Map
List of all project geometries:
ID Geometry Location Name
7944 polygon Lot 400 Plan 4688
7945 polygon Lot 401 Plan 4688
7946 polygon Lot 393 Plan 4648
7947 polygon Lot 394 Plan 4648
7948 polygon Lot 395 Plan 4647
7949 polygon Lot 396 Plan 4647
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Pits and quarries
Licensing Agencies
NIRB: Screening Decision Report
GN-CGS: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Loader 1 5.7m x 2.7m excavate quarry material
Dump Truck 1 2.5m x 3.4m Haul quarry material
Water Truck 1 10 tons Dust control
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 1 1 Liters Fuel will be provided by the Hamlet's facilities and supplies. There will be no storage of fuel on site.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
NA 1 0 Liters There will be no storage of hazardous material on site.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
Active creeks are not within the boundaries of the existing and proposed sites. Dust management will mitigate the effects of dust, silt, and fine sand. Excavation may expose underlying ice rich permafrost in surficial sand and gravel deposits. The Hamlet will manage drainage of pooling water by building ditches away from existing natural drainage and away from operation but within the boundaries of the site. There will be no discharge of water in the natural environment and into natural drainage paths. Vegetation will be removed from surface as the area will be excavated. Should an organic and root rich soil horizon be present, it will be stockpiled for use in reclamation of the pits.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Overburden (organic soil, waste material, tailings) 100000 none Dump trucks
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18923
Document Size: 0.11 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18924
Document Size: 0.42 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18925
Document Size: 1.39 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18926
Document Size: 1.6 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18927
Document Size: 1.45 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18928
Document Size: 1.45 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18929
Document Size: 1.4 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18930
Document Size: 1.35 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-08-31
Originator: Solomon Amuno
Public Registry ID: 18958
Document Size: 217.7 Kb