Project Dashboard

Kugaaruk Quarry Sites (149594)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Danny Zita
Company: Government of Nunavut
Schedule:
Start Date: 2021-08-01
End Date: 2031-08-01
Operation Type: Annual
Project Description:
Kugaaruk Quarry Sites (Lots 264,267,269 and 270) are being explored by the Hamlet for the extraction of aggregate (fine gravel, sand etc..) to meet the construction demands of the community
Personnel:
Persons: 2
Days: 1500
Project Map
List of all project geometries:
ID Geometry Location Name
7950 polygon Lot 264 Plan 4689
7951 polygon Lot 267 Plan 4689
7952 polygon Lot 269 Plan 4689
7953 polygon Lot 270 Plan 4689
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Pits and quarries
Licensing Agencies
NIRB: Screening Decision Report
GN-CGS: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Loader 1 5.7m x 2.7m excavate quarry material
Dump Truck 1 2.5mx3.4m Haul quarry material
Water Truck 1 10 tons Dust control
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 1 1 Liters Fuel will be provided by the Hamlet's facilities and supplies. There will be no storage of fuel on site.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
NA 1 0 Liters There will be no storage of hazardous material on site.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
Active creeks are not within the boundaries of the existing and proposed sites. Dust management will mitigate the effects of dust, silt, and fine sand. Excavation may expose underlying ice rich permafrost in surficial sand and gravel deposits. The Hamlet will manage drainage of pooling water by building ditches away from existing natural drainage and away from operation but within the boundaries of the site. There will be no discharge of water in the natural environment and into natural drainage paths. Vegetation will be removed from surface as the area will be excavated. Should an organic and root rich soil horizon be present, it will be stockpiled for use in reclamation of the pits.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Overburden (organic soil, waste material, tailings) 100000 none Dump trucks
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18931
Document Size: 1.58 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18932
Document Size: 1.45 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18933
Document Size: 1.32 Kb
Category: Imported geometry - proect geometry
Recieved: 2021-08-23
Originator: Danny Zita
Public Registry ID: 18934
Document Size: 1.51 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2021-08-31
Originator: Solomon Amuno
Public Registry ID: 18959
Document Size: 231.8 Kb