The Muskox Nickel Property (149739)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Grant Mourre
Company: SPC Nickel Corp.
Schedule:
Start Date: 2022-06-15
End Date: 2022-07-15
Operation Type: Seasonal
Project Description:
The Muskox Nickel Property ( the “Property” or the “Project”), owned and operated by SPC Nickel Corp. (“SPC” or the “Company”), consists of 12 mineral claims covering 14,893 hectares and 2 prospecting permits covering 30,350 hectares. The Property is separated into a North Block, located on National Topographic System (“NTS”) map sheets: 86O03 and 86J14 and centered at 574,500mE, 7,427,000mN, North American Datum 1983 (“NAD83” Universal Transverse Mercator (“UTM”) Zone 11, and a South Block, located on NTS map sheets: 86J02, 86J06, 86J07, 86J10 and 86J11 (centered at 591,600mE, 7,373,000mN, NAD83 Zone 11). The North Block is located approximately 100 km south of the Hamlet of Kugluktuk and partially overlaps Inuit Owned Land (“IOL”) surface parcels CO-52 and CO-60. The south block, located entirely on Crown land, is approximately 20 km south of the North Block and extends to the Nunavut - Northwest Territories border. SPC is currently planning a one week field project anticipated to commence in June and will include reconnaissance visits to both the North and South Blocks. The field program will be based out of the Hamlet of Kugluktuk with helicopter transportation providing daily access to and from the Project. The program will be completed by SPC employees (currently estimated to be three) and will consist primarily of prospecting and the collection of surface rock samples for analysis, visual geological information on known historic mineral occurrences, marketing material including photos and videos, as well as the scouting of potential future camp locations. The proposed work will be helicopter supported and require the occasional landing of the aircraft. All refueling will be conducted in Kugluktuk. No other use of mechanical equipment is proposed. In order to mitigate any potential impact on wildlife, the helicopter will always maintain a minimum altitude of 610 m (2,100 ft) above ground level except during landing, take-off or if there is a specific requirement for low level flying (e.g. airborne surveys). Wildlife will be avoided and the helicopter will not land in the presence of wildlife except in an emergency. Absolutely no activities will be conducted that will interfere with caribou cows and calves, and no exploration activities will cause a diversion in the migration patterns of any caribou. SPC will communicate with the Kitikmeot Inuit Association (“KIA”) and any other interested parties, regarding caribou sightings and appraised movements in the area. The 2022 program will not require any fuel to be cached on the Project, but future programs may require small temporary fuel caches (< 4,000 L or 9 drums) to facilitate the exploration program. If required, the fuel caches will be located on Crown land, stored within appropriate secondary containment and Crown-Indigenous Relations and Northern Affairs Canada (“CIRNAC”) will be notified prior to establishment. Any fuel cache established will have appropriate spill kits. The helicopter will provide a spill kit for any staging areas for take-off and landing. Any waste will be collected and disposed of in the Hamlet of Kugluktuk. Exploration programs may include additional non-destructive exploration activities such as ground and airborne geophysical surveys and geochemical soil/till sampling. Prior to subsequent years program commencement all the regulatory authorities will be notified and supplied with an updated work plan and schedule. If additional work is proposed that would require amendments or new approvals, such as a camp or drilling, SPC will immediately initiate the amendments and/or new applications for land use permits and/or water licences as appropriate for the type of work contemplated. Consultation with the Hamlet, Hunters and Trappers Organization and public of Kugluktuk is current being planned to be completed prior to the field program.
Personnel:
Persons: 3
Days: 8
Project Map
List of all project geometries:
ID Geometry Location Name
8634 polygon SPC Muskox Nickel Project Mineral Claims
8635 polygon SPC Muskox Nickel Project Prospecting Permits
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Inuit Owned Surface Lands
Settlement Area
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Mineral Exploration
Licensing Agencies
KitIA: Land Use Licence I
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Helicopter 1 Astar or Similar Transport Crew
Fuel Use
Type Container(s) Capacity UOM Use
No records found.
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
SPC Nickel Corp. is firmly committed to the protection and conservation of the natural environment and to ensuring the health and safety of all employees, contractors, and people in surrounding communities. Potential environmental impacts of the Muskox Nickel Property are negligible and mitigatable with little impacts on the environment. Effort will be made to avoid disturbances of wildlife and the environment. Denning and nesting sites will be avoided, and the locations recorded and provided to the regional wildlife authorities. All archaeological sites will be respected and reported immediately. The 2022 program will consist primarily of prospecting and the collection of surface rock samples for analysis, visual geological information on known historic mineral occurrences, marketing material including photos and videos, as well as the scouting of potential future camp locations. Any potential future programs will adhere to the following conditions: There will be no discharge of any kind into any water bodies. No drilling will be performed, or sump created within 31 m of the normal high-water mark of any water body. Additionally, all hazardous materials will be placed in secondary containment and stored a minimum of 31 m from the normal high-water mark of any water body. All waste materials will be incinerated, reused, recycled and/or disposed of at an accredited facility.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Combustible wastes minimal A policy of Bring whatever you brought in with you, out with you will be enforced. Any wastes provided will be taken back to the Hamlet of Kugluktuk at the end of each day for proper disposal.
Category: Imported geometry - proect geometry
Recieved: 2022-03-28
Originator: APEX Permitting Department
Public Registry ID: 19714
Document Size: 8.84 Kb
Category: Imported geometry - proect geometry
Recieved: 2022-03-28
Originator: APEX Permitting Department
Public Registry ID: 19715
Document Size: 2.85 Kb
Category: Application form attachment - License/ Authorization
Recieved: 2022-04-11
Originator: APEX Permitting Department
Public Registry ID: 19884
Document Size: 8.06 Kb
Category: Application form attachment - Other Authorizations
Recieved: 2022-03-28
Originator: APEX Permitting Department
Public Registry ID: 19726
Document Size: 15.03 Kb
Category: Application form attachment - Project description
Recieved: 2022-03-25
Originator: APEX Permitting Department
Public Registry ID: 19706
Document Size: 1603.07 Kb
Category: Application form attachment - Project description
Recieved: 2022-03-25
Originator: APEX Permitting Department
Public Registry ID: 19707
Document Size: 1599.32 Kb
Category: Application form attachment - Project description
Recieved: 2022-03-25
Originator: APEX Permitting Department
Public Registry ID: 19708
Document Size: 1612.49 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2022-05-09
Originator: Solomon Amuno
Public Registry ID: 20080
Document Size: 253.55 Kb