Project Dashboard

Application for Renewal of NWB Water Licence 2BE-MLL1722 (149780)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: Renewal
Proponent name: Katsky Venter
Company: Katsky Venter
Schedule:
Start Date: 2022-07-01
End Date: 2027-07-01
Operation Type: Seasonal
Project Description:
Sabina Gold & Silver Corp. (Sabina) would like to request a renewal and extension to the Nunavut Water Board (NWB) water license 2BE-MLL1722 for the Wishbone-Malley Project (the Project), Kitikmeot Region, Nunavut. Sabina is requesting a renewal of the license for a further five years from March 27th, 2017 to March 26th, 2022. A completed renewal application package has been attached here. The renewal does not represent a change in scope for the Project. All activities as currently defined will be consistent with the activities undertaken in previous years and consistent with current authorizations. Sabina is requesting only a change to the term of the licence. This Project was last reviewed by the NPC during the 2017 renewal of this Licence. An NPC determination concluding that the Project was outside the area of an applicable land use plan and that wit was exempt from screening by the NIRB was issued on March 22, 2017 (Attachment 3; NPC File # 148494). The first Type B Water Licence for the Wishbone-Malley Project was issued in 2012. The Licence was renewed without amendment in 2017. This Project was initially screened by the NIRB in 2006 (see May 15, 2006 NIRB Screening Decision Report – Bolder Property – File No. 06EN033 (Attachment 4). A consolidated screening of all Dundee Precious Metals Inc.’s holdings in the Beechy Lake area (inclusive of the Back River and Wishbone claim areas) was completed in 2008 under NIRB file 08EA084 and a screening decision report issued by the NIRB on March 3, 2009 (Attachment 5).
Personnel:
Persons: 60
Days: 245
Project Map
List of all project geometries:
ID Geometry Location Name
8785 polygon
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Inuit Owned Surface Lands
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Mine Development
Mineral Exploration
Trenching
Licensing Agencies
INAC:
KitIA:
NWB:
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Drills 4 4 Drilling
Pumps 10 10 Pumping
Trucks 1 1 Utility
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 1 15000 Liters Heat, Run equipment
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Batteries 1 5 Liters Boats, Equipment
Waste Oil 1 50 Liters Waste Oil Burner
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
200 Water intake will be guided by DFO guidelines (screens, rates) and metered. Domestic camp use - local lakes; Industrial use - lakes proximal to drilling targets.
Waste and Impacts
Environmental Impacts
Please see Box 15 (quantity and quality of wastes) of Attachment 1 of Application for Water Licence Renewal
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Sewage (human waste) 1-2 bags/day Offsite Incineration
Greywater 3 m3/day Collection sump Natural attenuation
Other 10 bags/ day Offsite Incineration
Other Empty drums Offsite Backhauled
Overburden (organic soil, waste material, tailings) 500 gallons Collection sump Natural attenuation
Other Variable Offsite Waste oil furnace
Category: Application form attachment - Project description
Recieved: 2022-07-11
Originator: Katsky Venter
Public Registry ID: 20521
Document Size: 7764.84 Kb
Category: Application related document - Conformity Determination Letter
Recieved: 2022-08-11
Originator: Solomon Amuno
Public Registry ID: 20609
Document Size: 231.4 Kb