Project Dashboard

Blasting Crushing & Screening of Granular Materials (149877)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Glen Molloy
Company: 5581 Nunavut Ltd
Schedule:
Start Date: 2022-09-15
End Date: 2022-10-30
Operation Type: Annual
Project Description:
5581 Nunavut Ltd. is building the New Landfill for the City of Iqaluit. The City has a quarry permit on the site. 5581 Nunavut Ltd is applying for a permit to use the traditional quarry operations methods including blasting, crushing and screening of the granular material.
Personnel:
Persons: 3
Days: 72
Project Map
List of all project geometries:
ID Geometry Location Name
9296 point Corner-1
9297 point Corner-2
9298 point Corner-3
9299 point Corner-4
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Pits and quarries
Licensing Agencies
NIRB: 0
CG&S: 0
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Excavator 1 6x2.5x2.5m Moving of Material
Crusher 1 10x2.5x2.5m Crushing and Screening of Material
Loader 1 5x3x3m Moving of material
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 0 0 Cubic Meters Fueling of equipment using a fuel Truck, no fuel to be stored on site
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
Diesel Fuel 0 0 Cubic Meters A fuel truck will be used to fuel the equipment, no fuel will be stored on site
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
No waste generation is anticipated as a result of this operation
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
No data found.
Category: Application related document - Conformity Determination Letter
Recieved: 2022-08-26
Originator: Adrian Gerhartz
Public Registry ID: 20663
Document Size: 230.3 Kb
2022-08-19 15:15:37, from: Adrian Gerhartz
 Hi Glen, please add authorizing agencies e.i City of Iqaluit, NIRB, etc. Also, note that your project start dates should also be modififed to allow time for the NPC and other regulatory agencies (NIRB) to review your application.